CH057A - Removal of Catenary Pole B-922W-S (05-17-2014)
CH057A - Removal of Catenary Pole B-922W-S (05-17-2014)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Gantry crane installation in the Biltmore Room of Grand Central Terminal at the former location of the Hudson Newsstand.  This crane will be used to install one of two  future LIRR passenger escalators. (CM014B 12-05-2017)
Gantry crane installation in the Biltmore Room of Grand Central Terminal at the former location of the Hudson Newsstand. This crane will be used to install one of two future LIRR passenger escalators. (CM014B 12-05-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Direct Fixation Fasteners or DFF track installation and supporting concrete pour in the 63rd Street tunnel .  (CM007, 10-11-2017)
Direct Fixation Fasteners or DFF track installation and supporting concrete pour in the 63rd Street tunnel . (CM007, 10-11-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Sidewalk replacement along 43rd Street in Sunnyside, Queens by a Federal/MTA Small Business Mentor Program Contractor as part of ESA’s Queens community beautification contract. (QMP-1, 9-27-2017)
Sidewalk replacement along 43rd Street in Sunnyside, Queens by a Federal/MTA Small Business Mentor Program Contractor as part of ESA’s Queens community beautification contract. (QMP-1, 9-27-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

FQA65 - Amtrak Signal Continue Trenching to Install Legs for Loop CIH (09-05-2017)
FQA65 - Amtrak Signal Continue Trenching to Install Legs for Loop CIH (09-05-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH057A - East Approach Stub Piles Installation (08-23-2017) 3
CH057A - East Approach Stub Piles Installation (08-23-2017) 3
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Millerhill 26s
Millerhill 26s
by dhtulyar

クリエイティブ・コモンズ 表示-改変禁止 2.1

Carpenters continue to install formwork around existing columns in the concourse. (CM014B, 1-03-2018)
Carpenters continue to install formwork around existing columns in the concourse. (CM014B, 1-03-2018)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Connecting pipes to a new sewer manhole below the street deck of 48th Street between Park and Madison Avenues. (CM014B 10-17-2017)
Connecting pipes to a new sewer manhole below the street deck of 48th Street between Park and Madison Avenues. (CM014B 10-17-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CM014B - ES30 & 31 Square and Set Upper and Lower Heads (05-15-2017)
CM014B - ES30 & 31 Square and Set Upper and Lower Heads (05-15-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CS179  PLZF (C06&B11)  - Layout & Installation of 1-inch Power Feed Conduits in Emergency Power Room 219 Area (05-01-2017)
CS179 PLZF (C06&B11) - Layout & Installation of 1-inch Power Feed Conduits in Emergency Power Room 219 Area (05-01-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH057A - Setting Rebar Cage for Catenary Pole Foundation In Ballfield (02-25-2015)
CH057A - Setting Rebar Cage for Catenary Pole Foundation In Ballfield (02-25-2015)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CH057 - H1 EOS Pad - Mobilization of Hand Rail for Installation (08-16-2017)
CH057 - H1 EOS Pad - Mobilization of Hand Rail for Installation (08-16-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CQ033 - Queens St. to Queens Blvd - Drill Cassions for Light Poles (07-19-2017)
CQ033 - Queens St. to Queens Blvd - Drill Cassions for Light Poles (07-19-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CM014B - Shaft No. 4 Forming Walls Machine Room Level (04-25-2017)
CM014B - Shaft No. 4 Forming Walls Machine Room Level (04-25-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Removing soil in the yard east of Queens Boulevard where the work is getting underway on the Mid-Day Storage Yard in Queens. (CQ033, 9-25-2017)
Removing soil in the yard east of Queens Boulevard where the work is getting underway on the Mid-Day Storage Yard in Queens. (CQ033, 9-25-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Sidewalk replacement by a Federal/MTA Small Business Mentor Program Contractor as part of ESA’s Queens community beautification contract. (QMP-1, 9-12-2017)
Sidewalk replacement by a Federal/MTA Small Business Mentor Program Contractor as part of ESA’s Queens community beautification contract. (QMP-1, 9-12-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH061A - Track A Approach Structure - Installing Strut Between Walers (08-21-2017)
CH061A - Track A Approach Structure - Installing Strut Between Walers (08-21-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CH057A - East Approach Excavation (08-15-2017)
CH057A - East Approach Excavation (08-15-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH057A - West Approach Walkway Bench Concrete Pour (06-27-2017) 2
CH057A - West Approach Walkway Bench Concrete Pour (06-27-2017) 2
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

FQA65 - Amtrak Signal Site Preparing for Loop Hut (05-09-2017)
FQA65 - Amtrak Signal Site Preparing for Loop Hut (05-09-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


FHL01 - LIRR 3rd Rail Continued to Install Conduit at G02 (04-02-2017)
FHL01 - LIRR 3rd Rail Continued to Install Conduit at G02 (04-02-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Excavation for the Track A approach structure under the 39th Street bridge. (CH061A, 10-31-2017)
Excavation for the Track A approach structure under the 39th Street bridge. (CH061A, 10-31-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Conduits that will supply power to the ground level LED lights in the B11 substation. (CQ033, 10-12-2017)
Conduits that will supply power to the ground level LED lights in the B11 substation. (CQ033, 10-12-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


QMP1 - Concrete placed for Steel faced curb  (07-26-2017)
QMP1 - Concrete placed for Steel faced curb (07-26-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH057A - West Approach Construction (04-19-2017) (2)
CH057A - West Approach Construction (04-19-2017) (2)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Metra Electric Line, Chicago, Illinois
Metra Electric Line, Chicago, Illinois
by Ken Lund

クリエイティブ・コモンズ 表示-継承 2.1


Material shipment inspection that was delivered to the concourse on existing rail. (CM014B, 1-02-2018)
Material shipment inspection that was delivered to the concourse on existing rail. (CM014B, 1-02-2018)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Soil compaction atop the new electric ductbank west of Queens Boulevard. (CQ033, 12-04-2017)
Soil compaction atop the new electric ductbank west of Queens Boulevard. (CQ033, 12-04-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

ESA Groin Rib Installation in the West Cavern Wellway 1 (06-14-2017) (19)
ESA Groin Rib Installation in the West Cavern Wellway 1 (06-14-2017) (19)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


FHL02 - LIRR Pull Cable at H2 CIL Location (06-10-2017)
FHL02 - LIRR Pull Cable at H2 CIL Location (06-10-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CM014B - Continue to Install Upper Decking and Skirts Install and Set Switches-Safety Devices (05-09-2017)
CM014B - Continue to Install Upper Decking and Skirts Install and Set Switches-Safety Devices (05-09-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Removing soil in the yard east of Queens Street where the work is getting underway on the Mid-Day Storage Yard in Queens. (CQ033, 9-24-2017)
Removing soil in the yard east of Queens Street where the work is getting underway on the Mid-Day Storage Yard in Queens. (CQ033, 9-24-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Application of shotcrete by qualified nozzlemen in elevator shaft 22 near the future Biltmore Connection. Shotcrete is used to create an even surface prior to the installation of formwork and structural concrete. (CH014B, 9-11-2017)
Application of shotcrete by qualified nozzlemen in elevator shaft 22 near the future Biltmore Connection. Shotcrete is used to create an even surface prior to the installation of formwork and structural concrete. (CH014B, 9-11-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CS179  PLZF (C06&B11) - Installation of Damper Tunnel Vent Damper -QTP-02 (05-10-2017)
CS179 PLZF (C06&B11) - Installation of Damper Tunnel Vent Damper -QTP-02 (05-10-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Gemeente Venlo, Provincie Limburg, Nederland: Station clock tower with NS (Nederlandse Spoorwegen) logo
Gemeente Venlo, Provincie Limburg, Nederland: Station clock tower with NS (Nederlandse Spoorwegen) logo
by wwwuppertal

クリエイティブ・コモンズ 表示 2.1


FHA02 - Transferring Catenary on Pole B-912 over LIRR Freight Track (01-06-2015)
FHA02 - Transferring Catenary on Pole B-912 over LIRR Freight Track (01-06-2015)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Appenzeller Bahnen - End of traditional Ruckhalde line 2018
Appenzeller Bahnen - End of traditional Ruckhalde line 2018
by Welcome to Switzerland backstage!

クリエイティブ・コモンズ 表示 2.1

CM005 - TT1 East Wall Installing PVC (09-28-2015)
CM005 - TT1 East Wall Installing PVC (09-28-2015)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CH057A - West Approach Wall Pour (08-16-2017)
CH057A - West Approach Wall Pour (08-16-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH057A - West Ballfield Spoils Removal with Hi-rail Tandem (08-12-2017) 2
CH057A - West Ballfield Spoils Removal with Hi-rail Tandem (08-12-2017) 2
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CS179 - 39th St. & B13 - Installation of Electrical Panels LPE-2 & Power Panel-2  in Motor Control Center Room at Station 1228+00 of Tunnel LL (2) (07-25-2017)
CS179 - 39th St. & B13 - Installation of Electrical Panels LPE-2 & Power Panel-2 in Motor Control Center Room at Station 1228+00 of Tunnel LL (2) (07-25-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CH061A - CPR-005 Crib Wall - Hand Excavating Where Crib Wall Will Be Installed North of the Trench Excavation West of the 39th St Bridge (07-26-2017)
CH061A - CPR-005 Crib Wall - Hand Excavating Where Crib Wall Will Be Installed North of the Trench Excavation West of the 39th St Bridge (07-26-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CQ032 YSB - Began Installing Column Encasements (09-09-2015)
CQ032 YSB - Began Installing Column Encasements (09-09-2015)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Vagao Kbkks CP Roco 66675 Modelismo Ferroviario Model Trains Modelleisenbahn modelisme ferroviaire ferromodelismo
Vagao Kbkks CP Roco 66675 Modelismo Ferroviario Model Trains Modelleisenbahn modelisme ferroviaire ferromodelismo
by Ayala Botto Modelismo Ferroviario Trains

クリエイティブ・コモンズ 表示-継承 2.1


Excavation for sidewalk replacement by a Federal/MTA Small Business Mentor Program Contractor as part of ESA’s Queens community beautification contract. (QMP-1, 9-11-2017)
Excavation for sidewalk replacement by a Federal/MTA Small Business Mentor Program Contractor as part of ESA’s Queens community beautification contract. (QMP-1, 9-11-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH057A - West Ballfield Spoils Removal with Hi-rail Tandem (08-12-2017) Gr...
CH057A - West Ballfield Spoils Removal with Hi-rail Tandem (08-12-2017) Gr...
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH061A - Track A Approach Structure - Loading Excavated Material into Dump Truck (06-23-2017)
CH061A - Track A Approach Structure - Loading Excavated Material into Dump Truck (06-23-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


FHL01 - LIRR 3rd Rail Continued Conduit Installation At G02 (05-07-2017)
FHL01 - LIRR 3rd Rail Continued Conduit Installation At G02 (05-07-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

FHA02 - Performed Catenary Wire Transfer at B-915W Over Line 3 (06-02-2015)
FHA02 - Performed Catenary Wire Transfer at B-915W Over Line 3 (06-02-2015)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Relocating railroad material east of Honeywell Street in Long Island City, Queens where work is getting underway on the Mid-Day Storage Yard. (CQ033, 10-02-2017)
Relocating railroad material east of Honeywell Street in Long Island City, Queens where work is getting underway on the Mid-Day Storage Yard. (CQ033, 10-02-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


ESA/LIRR Forces hand digging a 13-foot long trench for conduit leading to a 3rd Rail jumper in Harold Interlocking.  (FHL01, 9-11-2017)
ESA/LIRR Forces hand digging a 13-foot long trench for conduit leading to a 3rd Rail jumper in Harold Interlocking. (FHL01, 9-11-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH061A - Track A Approach Structure - Demo of Concrete at Track Tunnel Liner (08-16-2017)
CH061A - Track A Approach Structure - Demo of Concrete at Track Tunnel Liner (08-16-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

FHL02 - LIRR Continue Trench And Install 3rd Rail On Mainline 2(05-17-20...
FHL02 - LIRR Continue Trench And Install 3rd Rail On Mainline 2(05-17-20...
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CH057 - CPR-001 - Drilling Core Holes for the Installation of Guard Rails on the North, East and West Enclosure Walls (04-18-2017)
CH057 - CPR-001 - Drilling Core Holes for the Installation of Guard Rails on the North, East and West Enclosure Walls (04-18-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Filisur - Station RhB
Filisur - Station RhB
by Welcome to Switzerland backstage!

クリエイティブ・コモンズ 表示 2.1

Setting upper level pre-cast concrete beam that will support trains and pedestrian loads in the East Cavern. (CM007, 10-19-2017)
Setting upper level pre-cast concrete beam that will support trains and pedestrian loads in the East Cavern. (CM007, 10-19-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Equipment used to align, set height and adjust gauge of rail for the installation of revenue service track. (CM007, 10-12-2017)
Equipment used to align, set height and adjust gauge of rail for the installation of revenue service track. (CM007, 10-12-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

FHL01 - Clean Mud & Debris from Inside P-1 and Mont Cable Puller on Wall  Inside (08-25-2017)
FHL01 - Clean Mud & Debris from Inside P-1 and Mont Cable Puller on Wall Inside (08-25-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CM007 - East Cavern Precast Decking Installation (08-11-2017)
CM007 - East Cavern Precast Decking Installation (08-11-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1