商用無料の写真検索さん
           


catenary

タグをコピペすると、ブログなどにカンタン貼り付けできます。

各画像のライセンスに従って利用してください。被写体の肖像権、商標・意匠登録等にご注意ください。

詳しくはクリエイティブ・コモンズ・ライセンスの利用についてをご覧ください。

A maze of power feed conduits installed in the ceiling of a power sub station in Queens. (CS179, 10-24-2017)
A maze of power feed conduits installed in the ceiling of a power sub station in Queens. (CS179, 10-24-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

ESA/Amtrak signal personnel hand digging to expose and move cables in the way of foundations that will be installed as part of the Mid-day storage yard under another contract. (FHA02, 10-20-2017)
ESA/Amtrak signal personnel hand digging to expose and move cables in the way of foundations that will be installed as part of the Mid-day storage yard under another contract. (FHA02, 10-20-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

FHL02 - Install and Wire 110kv Transformers H and Location (08-12-2017)
FHL02 - Install and Wire 110kv Transformers H and Location (08-12-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Direct Fixation Fastener track installed in the 63rd Street tunnel. (CM007, 12-20-2017)
Direct Fixation Fastener track installed in the 63rd Street tunnel. (CM007, 12-20-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CM014B - Erecting Steel Joists at Tile 3613 (09-06-2017)
CM014B - Erecting Steel Joists at Tile 3613 (09-06-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CM006 - 50th St. Upper Level Duct Bench Form Prep (04-12-2017)
CM006 - 50th St. Upper Level Duct Bench Form Prep (04-12-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


SBB - Traction Current Protective Section
SBB - Traction Current Protective Section
by Welcome to Switzerland backstage!

クリエイティブ・コモンズ 表示 2.1

FHL02 - Continue FRA PR Testing TSR from Final to Stage 21 (08-13-2017)
FHL02 - Continue FRA PR Testing TSR from Final to Stage 21 (08-13-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installation of a pre-cast concrete deck panel which will form the passenger platform on the lower level of the East Cavern Terminal.  (CM007, 12-19-2017)
Installation of a pre-cast concrete deck panel which will form the passenger platform on the lower level of the East Cavern Terminal. (CM007, 12-19-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CH057A - Lead Abatement of Catenary B-920W-S (05-04-2014)
CH057A - Lead Abatement of Catenary B-920W-S (05-04-2014)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Underside of the 48th Street sidewalk where steel support is being replaced. (CM014B, 12-12-2017)
Underside of the 48th Street sidewalk where steel support is being replaced. (CM014B, 12-12-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

West end of the Track A approach structure which transitions trains from the surface tracks to the tunnel below ground. (CH061A, 10-19-2017)
West end of the Track A approach structure which transitions trains from the surface tracks to the tunnel below ground. (CH061A, 10-19-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


FHA02 - Amtrak ET Worked on Pole B-924W (04-10-2017)
FHA02 - Amtrak ET Worked on Pole B-924W (04-10-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH057C – Rail Relocation - Setting up Mini Rail Train (12-08-2015) (1)
CH057C – Rail Relocation - Setting up Mini Rail Train (12-08-2015) (1)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Loading excavated material from Track A Approach Structure under the 39th St bridge in Long Island City, Queens. (CH061A, 10-23-2017)
Loading excavated material from Track A Approach Structure under the 39th St bridge in Long Island City, Queens. (CH061A, 10-23-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Demolition of an existing sidewalk in Sunnyside, Queens by ESA’s Civil and Neighborhood Beautification Contract. (QMP-1, 10-04-2017)
Demolition of an existing sidewalk in Sunnyside, Queens by ESA’s Civil and Neighborhood Beautification Contract. (QMP-1, 10-04-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Structural steel support erection in the future LIRR concourse. (CM014B, 1-03-2018)
Structural steel support erection in the future LIRR concourse. (CM014B, 1-03-2018)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Raising and aligning revenue service track in one of the lead tunnels that connect to Sunnyside yard in Queens. (CM007, 10-23-2017)
Raising and aligning revenue service track in one of the lead tunnels that connect to Sunnyside yard in Queens. (CM007, 10-23-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Installing a temporary structural support beam (Waler) for the Tunnel A approach structure. (CH061A, 9-20-2017)
Installing a temporary structural support beam (Waler) for the Tunnel A approach structure. (CH061A, 9-20-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CS179  39th St.&B13 -Preparation and Layout for the Installation of Motor-Fan to Tunnel Vent Fan #1 - in Fan Room (05-01-2017)
CS179 39th St.&B13 -Preparation and Layout for the Installation of Motor-Fan to Tunnel Vent Fan #1 - in Fan Room (05-01-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

FHL01 - LIRR 3rd Rail Continued Conduit Installation for G02 (05-02-2017)
FHL01 - LIRR 3rd Rail Continued Conduit Installation for G02 (05-02-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


FHA02 - Catenary Transfers from Old to New Pole B-923W Over LI FRT Track (08-31-2015)
FHA02 - Catenary Transfers from Old to New Pole B-923W Over LI FRT Track (08-31-2015)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Vagao Us Ferrovias Electrotren 1810 Modelismo Ferroviario Model Trains Modelleisenbahn modelisme ferroviaire ferromodelismo
Vagao Us Ferrovias Electrotren 1810 Modelismo Ferroviario Model Trains Modelleisenbahn modelisme ferroviaire ferromodelismo
by Ayala Botto Modelismo Ferroviario Trains

クリエイティブ・コモンズ 表示-継承 2.1

Custom curved ceiling tiles at the top of passenger wellway 4. (CM014B, 12-12-2017)
Custom curved ceiling tiles at the top of passenger wellway 4. (CM014B, 12-12-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Installing support of excavation for the Tunnel A Approach Structure, under the 39th St bridge in Long Island City, Queens. (CH061A, 10-25-2017)
Installing support of excavation for the Tunnel A Approach Structure, under the 39th St bridge in Long Island City, Queens. (CH061A, 10-25-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Electrical duct bank and conduit installation west of Queens Boulevard for the future Mid-day Storage Yard. (CQ033, 11-02-2017)
Electrical duct bank and conduit installation west of Queens Boulevard for the future Mid-day Storage Yard. (CQ033, 11-02-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installation of a detention manhole for future utilities west of Queens Boulevard for the Mid-Day Storage Yard facility. (CQ033, 10-04-2017)
Installation of a detention manhole for future utilities west of Queens Boulevard for the Mid-Day Storage Yard facility. (CQ033, 10-04-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Curb replacement along 43rd Street in Sunnyside, Queens by ESA’s Civil and Neighborhood Beautification Contract. (QMP-1, 10-03-2017)
Curb replacement along 43rd Street in Sunnyside, Queens by ESA’s Civil and Neighborhood Beautification Contract. (QMP-1, 10-03-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Amtrak workers transferring catenary wires between old and new poles in Harold Interlocking. (F/A, 05-21-2019)
Amtrak workers transferring catenary wires between old and new poles in Harold Interlocking. (F/A, 05-21-2019)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installation of wooden lagging between soldier piles east of the 39th Street Bridge at the Track A approach structure. (CH061A, 12-18-2017)
Installation of wooden lagging between soldier piles east of the 39th Street Bridge at the Track A approach structure. (CH061A, 12-18-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Removal of debris from the demolition of the New York & Atlantic Railway building in Sunnyside Yard. Demolition of this building clears the way for the construction of the Mid-Day Storage Yard. (CQ033, 10-19-2017)
Removal of debris from the demolition of the New York & Atlantic Railway building in Sunnyside Yard. Demolition of this building clears the way for the construction of the Mid-Day Storage Yard. (CQ033, 10-19-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Pre-cast platform wall which will form the lower level passenger platform in the West Cavern Terminal. (CM007, 10-17-2017)
Pre-cast platform wall which will form the lower level passenger platform in the West Cavern Terminal. (CM007, 10-17-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Welding support of excavation for the Tunnel A Approach Structure, west of the 39th St bridge. (CH061A, 10-20-2017)
Welding support of excavation for the Tunnel A Approach Structure, west of the 39th St bridge. (CH061A, 10-20-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


FHA02 - Performed Catenary Wire Transfer at B-915W Over LI FRT Track (06-09-2015)
FHA02 - Performed Catenary Wire Transfer at B-915W Over LI FRT Track (06-09-2015)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Plasser & Theurer MTW 100 083 by Ayala Botto - DB Bahnbau Kibri 16082 Modelismo Ferroviario Model Trains Modelleisenbahn modelisme ferroviaire ferromodelismo
Plasser & Theurer MTW 100 083 by Ayala Botto - DB Bahnbau Kibri 16082 Modelismo Ferroviario Model Trains Modelleisenbahn modelisme ferroviaire ferromodelismo
by AyalaBotto Model Trains

クリエイティブ・コモンズ 表示-継承 2.1

ESA/LIRR Forces installing track wires to a new signal for the not yet in service Main Line 4 track. (FHL02, 10-03-2017)
ESA/LIRR Forces installing track wires to a new signal for the not yet in service Main Line 4 track. (FHL02, 10-03-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Concrete slab constructed to seal off the groundwater from penetrating the Track A approach structure. (CH061A, 11-01-2017)
Concrete slab constructed to seal off the groundwater from penetrating the Track A approach structure. (CH061A, 11-01-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Support bracing for glass curtain wall in passenger escalator wellway 3 . (CM014B 10-18-2017)
Support bracing for glass curtain wall in passenger escalator wellway 3 . (CM014B 10-18-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installing formwork for a concrete structure in preparation for the demolition of the Montauk cut-off.   (CQ033, 10-11-2017)
Installing formwork for a concrete structure in preparation for the demolition of the Montauk cut-off. (CQ033, 10-11-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CH057A - West Approach Walkway Bench Concrete Pour (06-27-2017)
CH057A - West Approach Walkway Bench Concrete Pour (06-27-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Bad Hersfeld (Hessen): working on the high voltage catenary
Bad Hersfeld (Hessen): working on the high voltage catenary
by wwwuppertal

クリエイティブ・コモンズ 表示 2.1

Excavation for a detention pipe between which will be installed between two manholes east of Queens Street. (CQ033, 11-03-2017)
Excavation for a detention pipe between which will be installed between two manholes east of Queens Street. (CQ033, 11-03-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CM014B - 44th St Vent Building Setback Roof Installation of Barrel Ladder (08-16-2017)
CM014B - 44th St Vent Building Setback Roof Installation of Barrel Ladder (08-16-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH053 – Erection of Catenary B-913E South Pole (10-18-2015)(1)
CH053 – Erection of Catenary B-913E South Pole (10-18-2015)(1)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

ESA/Amtrak Forces grading the area for the new Amtrak Loop Central Instrument Hut which will control signals in Amtrak territory.  (FHA65, 10-11-2017)
ESA/Amtrak Forces grading the area for the new Amtrak Loop Central Instrument Hut which will control signals in Amtrak territory. (FHA65, 10-11-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


PCC Turning
PCC Turning
by H. Michael Miley

クリエイティブ・コモンズ 表示-継承 2.1

SBB - EIZ Erstfeld
SBB - EIZ Erstfeld
by Welcome to Switzerland backstage!

クリエイティブ・コモンズ 表示 2.1

Excavation utilizing trench boxes for support of excavation west of Queens Boulevard for the Mid-Day Storage Yard facility. (CQ033, 12-04-2017)
Excavation utilizing trench boxes for support of excavation west of Queens Boulevard for the Mid-Day Storage Yard facility. (CQ033, 12-04-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


ESA/Amtrak Forces delivering a pull box that measures 13’ long, 6’ wide’ and 4’ deep. This box will be dug into the ground and support the new Loop Central Instrument Hut. (FHA02, 9-30-2017)
ESA/Amtrak Forces delivering a pull box that measures 13’ long, 6’ wide’ and 4’ deep. This box will be dug into the ground and support the new Loop Central Instrument Hut. (FHA02, 9-30-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

FHL02 - Installed Conduit from SM37A Case to Switch Machine (04-26-2017)
FHL02 - Installed Conduit from SM37A Case to Switch Machine (04-26-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Pre-cast platform wall which will form the lower level passenger platform in the West Cavern Terminal. (CM007, 10-27-2017)
Pre-cast platform wall which will form the lower level passenger platform in the West Cavern Terminal. (CM007, 10-27-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Installation of stainless steel reveal and custom curved ceiling panel in future passenger escalator wellway 3 (CM014B 10-30-2017)
Installation of stainless steel reveal and custom curved ceiling panel in future passenger escalator wellway 3 (CM014B 10-30-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CM014B - WW1 Continue to Install Various Miscellaneous Parts & Continue to Connect Step Chains (08-16-2017)
CM014B - WW1 Continue to Install Various Miscellaneous Parts & Continue to Connect Step Chains (08-16-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installation of formwork for interior walls at the Track A approach structure. (CH061A, 1-02-2018)
Installation of formwork for interior walls at the Track A approach structure. (CH061A, 1-02-2018)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Installing a catenary pole west of the 39th Street bridge.(CH061A, 07-09-18)
Installing a catenary pole west of the 39th Street bridge.(CH061A, 07-09-18)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installation of detention pipe installation in Sunnyside Yard in Queens. (CQ033, 10-20-2017)
Installation of detention pipe installation in Sunnyside Yard in Queens. (CQ033, 10-20-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH061A - Track A Secant Piles - Installation of Core Beams for Primary Secant Piles 2P and 4P Under the 29th St Bridge (08-16-2017)
CH061A - Track A Secant Piles - Installation of Core Beams for Primary Secant Piles 2P and 4P Under the 29th St Bridge (08-16-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


FHA02 - Remove Catenary And Body Span Old Pole B-913 (01-26-2016)
FHA02 - Remove Catenary And Body Span Old Pole B-913 (01-26-2016)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Concrete placement to set the tracks in one of the lead tunnels that connects the Manhattan caverns to Sunnyside yard in Queens. (CM007, 11-09-2017)
Concrete placement to set the tracks in one of the lead tunnels that connects the Manhattan caverns to Sunnyside yard in Queens. (CM007, 11-09-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Steel roof decking along the 44th Street passenger corridor. (CM014B, 12-12-2017)
Steel roof decking along the 44th Street passenger corridor. (CM014B, 12-12-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1



661件~720件 (全 3,117件)

(C)名入れギフト.com