商用無料の写真検索さん
           


catenary

タグをコピペすると、ブログなどにカンタン貼り付けできます。

各画像のライセンスに従って利用してください。被写体の肖像権、商標・意匠登録等にご注意ください。

詳しくはクリエイティブ・コモンズ・ライセンスの利用についてをご覧ください。

Excavation for the Track A Approach Structure west of the 39th Street bridge. (CH061A, 10-11-2017)
Excavation for the Track A Approach Structure west of the 39th Street bridge. (CH061A, 10-11-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

ESA/Amtrak Forces hand excavating for the installation of a pull box that will transition cable from trenching to the new Loop Central Instrumentation Hut (CIH) which will control the tracks, switches and signals along the Loop track used by Amtrak at the
ESA/Amtrak Forces hand excavating for the installation of a pull box that will transition cable from trenching to the new Loop Central Instrumentation Hut (CIH) which will control the tracks, switches and signals along the Loop track used by Amtrak at the
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

QMP1 - Concrete Placed for YL Driveway (08-17-2017)
QMP1 - Concrete Placed for YL Driveway (08-17-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


dawn catenary.jpg
dawn catenary.jpg
by STC4blues

クリエイティブ・コモンズ 表示-継承 2.1

Subbase made up of crush stone for utilities including sanitary and fire lines for the future Mid-day Storage Yard in Long Island City, Queens. (CQ033, 12-26-2017)
Subbase made up of crush stone for utilities including sanitary and fire lines for the future Mid-day Storage Yard in Long Island City, Queens. (CQ033, 12-26-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Glass curtain wall in escalator wellway 3. (CM014B, 12-12-2017)
Glass curtain wall in escalator wellway 3. (CM014B, 12-12-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Placing stone atop drainage piping between two sewer manholes for the future Mid-day Storage Yard. (CQ033, 12-13-2017)
Placing stone atop drainage piping between two sewer manholes for the future Mid-day Storage Yard. (CQ033, 12-13-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Sewer manhole and drainage piping for the Mid-day Storage Yard.  (CQ033, 12-13-2017)
Sewer manhole and drainage piping for the Mid-day Storage Yard. (CQ033, 12-13-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Demolition of a pier of the Montauk Cutoff, in preparation for the construction of the Mid-day Storage Yard in Queens.   (CQ033, 10-29-2017)
Demolition of a pier of the Montauk Cutoff, in preparation for the construction of the Mid-day Storage Yard in Queens. (CQ033, 10-29-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Concrete pile cap poured at the East Approach for the planned Amtrak Westbound Bypass Tunnel which will send trains below the existing LIRR tracks. (CH057A, 9-13-2017)
Concrete pile cap poured at the East Approach for the planned Amtrak Westbound Bypass Tunnel which will send trains below the existing LIRR tracks. (CH057A, 9-13-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CQ033 - Montauk Cutoff - Removing Rail & Ties (08-15-2017)
CQ033 - Montauk Cutoff - Removing Rail & Ties (08-15-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

MGB - New Station Nätschen
MGB - New Station Nätschen
by Welcome to Switzerland backstage!

クリエイティブ・コモンズ 表示 2.1


Installation of a pre-cast interior platform wall which will form the lower level passenger platform in the West Cavern Terminal. (CM007, 12-13-2017)
Installation of a pre-cast interior platform wall which will form the lower level passenger platform in the West Cavern Terminal. (CM007, 12-13-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installation of drainage piping between two sewer manholes for the future Mid-day Storage Yard. (CQ033, 12-13-2017)
Installation of drainage piping between two sewer manholes for the future Mid-day Storage Yard. (CQ033, 12-13-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Foundation for a light pole installed west of Queens Boulevard. (CQ033, 11-29-2017)
Foundation for a light pole installed west of Queens Boulevard. (CQ033, 11-29-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Andermatt - MGB Fahrleitungswagen X 2911
Andermatt - MGB Fahrleitungswagen X 2911
by Welcome to Switzerland backstage!

クリエイティブ・コモンズ 表示 2.1

Construction zone preparation at track level in Grand Central Terminal to support the installation of two new escalators that will connect future LIRR passengers to the Biltmore Room. (CM014B 11-28-2017)
Construction zone preparation at track level in Grand Central Terminal to support the installation of two new escalators that will connect future LIRR passengers to the Biltmore Room. (CM014B 11-28-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installation of helical piles to support trough at track level along a train bridge in Woodside, Queens. (CQ033, 11-05-2017)
Installation of helical piles to support trough at track level along a train bridge in Woodside, Queens. (CQ033, 11-05-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Hand digging the street at East 48th Street between Park and Madison Avenues for an upcoming water main replacement. (CM014B 10-24-2017)
Hand digging the street at East 48th Street between Park and Madison Avenues for an upcoming water main replacement. (CM014B 10-24-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Ceiling installation in the future LIRR passenger concourse. (CM014B 10-23-2017)
Ceiling installation in the future LIRR passenger concourse. (CM014B 10-23-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Teeny layout with catenary
Teeny layout with catenary
by James E. Petts

クリエイティブ・コモンズ 表示-継承 2.1


Cable installation in a manhole that will connect to the B10 substation located on Northern Boulevard, Queens. (CS179, 12-27-2017)
Cable installation in a manhole that will connect to the B10 substation located on Northern Boulevard, Queens. (CS179, 12-27-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Grading the subbase of the Tunnel A approach structure in advance of the installation of a mud slab that will create the base for this tunnel. (CH061A, 10-31-2017)
Grading the subbase of the Tunnel A approach structure in advance of the installation of a mud slab that will create the base for this tunnel. (CH061A, 10-31-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Soldier piles and lagging for the Track A approach structure east of the 39th Street bridge. (CH061A, 12-15-2017)
Soldier piles and lagging for the Track A approach structure east of the 39th Street bridge. (CH061A, 12-15-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


QMP1 - Pouring Concrete for Driveway (08-17-2017)
QMP1 - Pouring Concrete for Driveway (08-17-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH057 - Catenary B-927 AN - Erection of Catenary Pole and Cantilever Arms (02-20-2017)
CH057 - Catenary B-927 AN - Erection of Catenary Pole and Cantilever Arms (02-20-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installing support of excavation for the Tunnel A Approach Structure, west of the 39th St bridge in Long Island City, Queens. (CH061A, 11-29-2017)
Installing support of excavation for the Tunnel A Approach Structure, west of the 39th St bridge in Long Island City, Queens. (CH061A, 11-29-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Steel support for the demolition of the express track at the Biltmore connection in GCT. (CM014B, 12-27-2017)
Steel support for the demolition of the express track at the Biltmore connection in GCT. (CM014B, 12-27-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installation of a pre-cast interior platform wall which will form the lower level passenger platform in the East Cavern Terminal. (CM007, 11-30-2017)
Installation of a pre-cast interior platform wall which will form the lower level passenger platform in the East Cavern Terminal. (CM007, 11-30-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Pre-cast platform wall which will form the lower level passenger platform in the West Cavern Terminal. (CM007, 11-28-2017)
Pre-cast platform wall which will form the lower level passenger platform in the West Cavern Terminal. (CM007, 11-28-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Setting upper level pre-cast concrete beam that will support trains and pedestrian loads in the East Cavern. (CM007, 10-12-2017)
Setting upper level pre-cast concrete beam that will support trains and pedestrian loads in the East Cavern. (CM007, 10-12-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

DBDGE BOX 300588
DBDGE BOX 300588
by HHA124L

クリエイティブ・コモンズ 表示-継承 2.1

Amtrak workers installing new catenary spans and bell suspenders as part of ongoing improvements in Harold Interlocking. These improvements have an immediate impact on train service through the interlocking. 05-11-2019
Amtrak workers installing new catenary spans and bell suspenders as part of ongoing improvements in Harold Interlocking. These improvements have an immediate impact on train service through the interlocking. 05-11-2019
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Testing an inclinometer installed on a secant pile under the 39th Street bridge. This instrumentation will monitor subsurface movements while the Track A approach structure is under construction. (CH061A, 10-18-2017)
Testing an inclinometer installed on a secant pile under the 39th Street bridge. This instrumentation will monitor subsurface movements while the Track A approach structure is under construction. (CH061A, 10-18-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Conduits that will supply power to LED lights in the B13 substation. (CQ033, 10-16-2017)
Conduits that will supply power to LED lights in the B13 substation. (CQ033, 10-16-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Direct Fixation Fastener track installed in the 63rd Street tunnel. (CM007, 11-21-2017)
Direct Fixation Fastener track installed in the 63rd Street tunnel. (CM007, 11-21-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CM007 - East Cavern - Upper Level (07-21-2017)
CM007 - East Cavern - Upper Level (07-21-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Saint Louis Historical Old Courthouse
Saint Louis Historical Old Courthouse
by Wisconsin Denizen

クリエイティブ・コモンズ 表示 2.1

Night gang works to install two dead end tails for the AC catenary system in Harold Interlocking. (Force Account, 02-28-2018)
Night gang works to install two dead end tails for the AC catenary system in Harold Interlocking. (Force Account, 02-28-2018)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


CH053 – Removal of Existing Catenary B-916E South Pole (03-05-2014)
CH053 – Removal of Existing Catenary B-916E South Pole (03-05-2014)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Smoke plenum in the West Cavern Terminal that will serve as an exhaust in the unlikely event of a smoke condition in the terminal. (CM007, 12-18-2017)
Smoke plenum in the West Cavern Terminal that will serve as an exhaust in the unlikely event of a smoke condition in the terminal. (CM007, 12-18-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Transferring a wire from existing catenary pole to new pole as part of ongoing improvements in Harold Interlocking.  06-22-2019
Transferring a wire from existing catenary pole to new pole as part of ongoing improvements in Harold Interlocking. 06-22-2019
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Deutsche Reichsbahn Cursdorf- Lichtenhain electric train, Thüringerwald   Aug 1991
Deutsche Reichsbahn Cursdorf- Lichtenhain electric train, Thüringerwald Aug 1991
by Sludge G

クリエイティブ・コモンズ 表示-継承 2.1

Track protection installed at GCT Track 41 and 42 in advance of demolition at the express track level. (CM014B, 12-11-2017)
Track protection installed at GCT Track 41 and 42 in advance of demolition at the express track level. (CM014B, 12-11-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Concrete placement in the new mechanical room of the 63rd Street ventilation facility.   (CS179, 11-02-2017)
Concrete placement in the new mechanical room of the 63rd Street ventilation facility. (CS179, 11-02-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Demolition of a concrete and steel structure known as the Montauk Cutoff, in preparation for the construction of the Mid-day Storage Yard in Queens.   (CQ033, 10-29-2017)
Demolition of a concrete and steel structure known as the Montauk Cutoff, in preparation for the construction of the Mid-day Storage Yard in Queens. (CQ033, 10-29-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH061A - Track A Approach Structure - Installing Lagging Between Soldier Piles (08-15-2017)
CH061A - Track A Approach Structure - Installing Lagging Between Soldier Piles (08-15-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

FHA02 - Amtrak Trenched for Trough Installation (04-18-2017)
FHA02 - Amtrak Trenched for Trough Installation (04-18-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Welding a copper pipe connection for a 6” water main. (CM014B, 1-02-2018)
Welding a copper pipe connection for a 6” water main. (CM014B, 1-02-2018)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH057A - Lead Abatement of Catenary B-913E (N) Foundation Base (04-15-2014)
CH057A - Lead Abatement of Catenary B-913E (N) Foundation Base (04-15-2014)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Custom curved ceiling panels, light fixtures and speakers at the top of passenger wellway 4. (CM014B, 12-20-2017)
Custom curved ceiling panels, light fixtures and speakers at the top of passenger wellway 4. (CM014B, 12-20-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Preparing and mobilizing crushed stone that will form the sub–base of the Tunnel A Approach Structure. (CH061A, 11-29-2017)
Preparing and mobilizing crushed stone that will form the sub–base of the Tunnel A Approach Structure. (CH061A, 11-29-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Safety protocols, including a positive ventilation supply and a scaffold, in place while a workers pull cable between manholes. (CQ033, 11-02-2017)
Safety protocols, including a positive ventilation supply and a scaffold, in place while a workers pull cable between manholes. (CQ033, 11-02-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Wuppertal-Sonnborn: Actors in historic costumes pose in front of an old tramway...
Wuppertal-Sonnborn: Actors in historic costumes pose in front of an old tramway...
by wwwuppertal

クリエイティブ・コモンズ 表示 2.1


CH057A - Lead Abatement of Catenary B-915E-N Base (05-13-2014)
CH057A - Lead Abatement of Catenary B-915E-N Base (05-13-2014)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Steel beam for the roof decking in a future passenger elevator. (CM014B, 12-18-2017)
Steel beam for the roof decking in a future passenger elevator. (CM014B, 12-18-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

Installation of custom curved ceiling tiles at the bottom of passenger wellway 3. (CM014B 11-29-2017)
Installation of custom curved ceiling tiles at the bottom of passenger wellway 3. (CM014B 11-29-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1


Sidewalk replacement along 43rd Street in Sunnyside, Queens by ESA’s Civil and Neighborhood Beautification Contract. (QMP-1, 10-04-2017)
Sidewalk replacement along 43rd Street in Sunnyside, Queens by ESA’s Civil and Neighborhood Beautification Contract. (QMP-1, 10-04-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CH057A - East Approach Stub Piles Installation (08-30-2017)
CH057A - East Approach Stub Piles Installation (08-30-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1

CM014B - Installation of Smoke Purge Fan at Mechanical Room B3308 (04-17-2017)
CM014B - Installation of Smoke Purge Fan at Mechanical Room B3308 (04-17-2017)
by MTA C&D - EAST SIDE ACCESS

クリエイティブ・コモンズ 表示 2.1



601件~660件 (全 3,164件)

(C)名入れギフト.com