KSC-95PC-0649_3 : 無料・フリー素材/写真
KSC-95PC-0649_3 / San Diego Air & Space Museum Archives
ライセンス | No known copyright restrictions(著作権制限なし) |
---|---|
説明 | Inside the cavernous Vehicle Assembly Building, workers carry out the meticulous process of lifting the orbiter Discovery from a horizontal to a vertical position. Once upright, Discovery will be transferred into a high bay for mating with the external tank/solid rocket booster assembly already mounted on the mobile launcher platform. Completing the assembly takes about five working days. Discovery's next destination: Launch Pad 39B, and final preparations for liftoff on Mission STS-70 in early June.Image from NASA, originally appeared on this site: science.ksc.nasa.gov/gallery/photos/Reposted by San Diego Air and Space Museum |
撮影日 | 2020-10-19 11:23:48 |
撮影者 | San Diego Air & Space Museum Archives |
撮影地 |