USACE ahead of schedule on USAREUR command, battle center construction : 無料・フリー素材/写真
USACE ahead of schedule on USAREUR command, battle center construction / USACE Europe District
ライセンス | クリエイティブ・コモンズ 表示 2.1 |
---|---|
説明 | John Wutzer, design chief for the U.S. Army Corps of Engineers Europe District, looks out over the future U.S. Army Europe Command and Battle Center Sept. 23, 2010, during a site visit. Construction is ahead of schedule on the $129 million facility, located on the Wiesbaden Army Airfield in Germany. The 285,000-square-foot operations center is being managed by the Europe District. (U.S. Army Corps of Engineers photo by Brian Finn) |
撮影日 | 2010-09-23 19:38:17 |
撮影者 | USACE Europe District , Wiesbaden, Germany |
タグ | |
撮影地 | |
カメラ | NIKON D40X , NIKON CORPORATION |
露出 | 0.006 sec (1/160) |
開放F値 | f/7.1 |
焦点距離 | 22 mm |