Finishing line repairs to East End Substation : 無料・フリー素材/写真
Finishing line repairs to East End Substation / Western Area Power Admin
ライセンス | クリエイティブ・コモンズ 表示 2.1 |
---|---|
説明 | DOE-WAPA crews make final repairs to the St. Thomas' TuTu-East End 34.5kv transmission line, Oct. 19. The crews have replaced utility poles and then restrung, clipped in and sagged the line between the two substations. The repaired line aids US Virgin Islands Water and Power Authority in restoring power to East End Substation and then sequentially to the submarine 34.5-kv cable to St. John. (Photo by Will Schnyer) |
撮影日 | 2017-10-20 08:34:52 |
撮影者 | Western Area Power Admin |
タグ | |
撮影地 |