Step 5: Structure setting step-by-step, Oct. 14 : 無料・フリー素材/写真
Step 5: Structure setting step-by-step, Oct. 14 / Western Area Power Admin
ライセンス | クリエイティブ・コモンズ 表示 2.1 |
---|---|
説明 | Structure setting step 5: Held secure by a digger derrick, the WAPA crew aligns and sets the new structure in the ground, Oct. 14. Before power can be restored on St. Thomas, new utility structures must be placed and secured. Twenty-five WAPA employees are working to repair the transmission system on St. Thomas, Oct. 14, that will feed power to the submarine cable for St. John. (Photo by Will Schnyer) |
撮影日 | 2017-10-15 19:35:22 |
撮影者 | Western Area Power Admin |
タグ | |
撮影地 |