商用無料の写真検索さん
           


LUAS CROSS CITY [CONSTRUCTION UNDERWAY - CABRA AND PHIBSBORO]-128494 : 無料・フリー素材/写真

LUAS CROSS CITY [CONSTRUCTION UNDERWAY - CABRA AND PHIBSBORO]-128494 / infomatique
このタグをブログ記事に貼り付けてください。
トリミング(切り除き):
使用画像:     注:元画像によっては、全ての大きさが同じ場合があります。
サイズ:横      位置:上から 左から 写真をドラッグしても調整できます。
あなたのブログで、ぜひこのサービスを紹介してください!(^^
LUAS CROSS CITY [CONSTRUCTION UNDERWAY - CABRA AND PHIBSBORO]-128494

QRコード

ライセンスクリエイティブ・コモンズ 表示-継承 2.1
説明I had a bit of a strange conversation while photographing the Luas construction works. I asked a construction worker about the bridge on the North Circular and he responded by directing me to a restaurant which served excellent ‘Chicken Maryland’.In 1845 the Midland and Great Western Railway Company purchased the entire royal canal infrastructure as they planned to use the harbours and the land beside the canal to construct a railway line to the west of Ireland. The Railway Company identified the harbour site at Broadstone as their major station site. In 1848 they created a new railway from Broadstone running north along the western edge of Phibsboro under a bridge on the North Circular road. The bridge does appear to have a specific name.Today a new tram line is being installed and a major stop to be known as the Phibsborough Stop will be located within the former Broadstone railway cutting between North Circular Road and Cabra Road and will have lateral platforms. Access to the platform level will be provided from both North Circular Road and Cabra Road via stairs and lifts from the new deck levels abutting the existing road overbridges. This stop will serve the existing residential communities and facilitate interchange with bus services on North Circular Road and Cabra Road.The first phase started in June 2016, which involved the strengthening of the arches under the North Circular Road and Cabra Road bridges. Further reinforcement at the bridges includes parapet strengthening works. The piling works for the lift shafts at North Circular Road and Cabra Road bridges are now completed.Lift shafts at NCR Bridge and Cabra Road Bridge are currently under construction.Parapet strengthening works are progressing. The North Parapet is complete on Cabra Road Bridge with the new railing to be erected.
撮影日2017-05-08 17:10:04
撮影者infomatique , Dublin, Ireland
タグ
撮影地
カメラILCE-7RM2 , SONY
露出0.003 sec (1/400)
開放F値f/5.0
焦点距離18 mm


(C)名入れギフト.com