商用無料の写真検索さん
           


Victorian Government Brochure - Level Crossing Removal : 無料・フリー素材/写真

Victorian Government Brochure - Level Crossing Removal / AS 1979
このタグをブログ記事に貼り付けてください。
トリミング(切り除き):
使用画像:     注:元画像によっては、全ての大きさが同じ場合があります。
サイズ:横      位置:上から 左から 写真をドラッグしても調整できます。
あなたのブログで、ぜひこのサービスを紹介してください!(^^
Victorian Government Brochure - Level Crossing Removal

QRコード

ライセンスクリエイティブ・コモンズ 表示 2.1
説明Brochure distributed around the Dandenong rail corridor for the Andrews Government's level crossing removal program which was part of its election campaign in the November 2014 electionThe previous Liberal government had funded a number of crossing removals now underway with a separate package for the Dandenong Line with crossings at Centre Road and Clayton Road in Clayton to go, along with crossings at Carnegie and Murrumbeena. The project was cancelled - labelled a 'con' by Andrews, and a new one initiated which will see the remaining five go as well. It should be noted here that the treatment now is to locally lower the rail line under the road by default at individual locations rather than regrading large sections or moving the road where it may also be possible. The cost for one location is now in the range of $150 - $200 million with a station rebuild and associated civil works with the government planning to grade separate 50 such locations around Melbourne - all somehow funded by state money alone. With the cancellation of East West toll road between the Eastern Freeway and CityLink and little construction work in Melbourne at the time of this posting, the Andrews Government has now re-branded the crossing removals as a major project with a 'Level Crossing Removal Authority' (LXRA) to oversee it. The other major project in the pipeline is the Melbourne Metro which will not start construction for some time yet. Other projects to start include widening of the Tullarmarine Freeway and a proposal for a port connection to the already-busy West Gate Freeway as a replacement for East West - first mooted under the Brumby Labor Government's Eddington Transport Plan. Level crossing removals were done at numerous locations around Melbourne in the 1960's and early 70's before a hiatus of work in the 1980's and 90's (freeway building in Melbourne also went quiet in the 1980s before resuming in the 1990's). Significantly increased rail patronage in recent years meant increased services which have resulted in boom gates down for lengthy periods of time on some lines - particularly on the busy Dandenong Corridor.The image here is of the Poath Road level crossing at Hughesdale looking south (see map tag)Thanks to Vax80 for the brochure.
撮影日2015-10-15 08:10:05
撮影者AS 1979 , Melbourne, Australia
タグ
撮影地Melbourne, Victoria, Australia 地図


(C)名入れギフト.com