US 220/NC 68 Connector (Future I-73) Work Zone April 27, 2015 : 無料・フリー素材/写真
US 220/NC 68 Connector (Future I-73) Work Zone April 27, 2015 / NCDOTcommunications
| ライセンス | クリエイティブ・コモンズ 表示 2.1 |
|---|---|
| 説明 | Construction Update: Structures: Taxi Way Structure: Interior Bent #2 micro pile continued. First pour for Bent #2 footing completed. Forming remainder of Bent #2 ongoing. Abutment 1 Soil Nail testing completed. STR 3 & 4: Structures excavation began. Culverts: Construction of Culvert @ 376+32 and finish work on Pedestrian Culvert @ 379+00 ongoing.Earthwork & Grading: (1013523 CY JTD) Earthwork operations and structures excavation began at Structure 3 & 4. Grading of L 205+00 to 215+00 continued. Excess blast rock hauled to RP1D Gore.Environmental: Erosion control devices continued to be installed as clearing operations progressed. Maintenance of erosion control measures continued. Routine inspections of the project’s erosion control and Environmental Sensitive Areas continue.Clearing & Grubbing: (157 AC JTD) Clearing and grubbing completed between Y5 & Y6. Clearing crews began to work back from Y4 to Permit Site 11. Additional clearing crews started clearing I-5110.Drainage: R2413A Permit Site 10 Drainage completed. Permit Site 11 Drainage began. |
| 撮影日 | 2015-04-27 12:40:12 |
| 撮影者 | NCDOTcommunications |
| 撮影地 | |
| カメラ | Canon EOS REBEL T5i , Canon |
| 露出 | 0.003 sec (1/320) |
| 開放F値 | f/7.1 |
| 焦点距離 | 109 mm |