Mandovi Third Bridge progress 7.4.2015 : 無料・フリー素材/写真
Mandovi Third Bridge progress 7.4.2015 / joegoauk72
ライセンス | クリエイティブ・コモンズ 表示-継承 2.1 |
---|---|
説明 | 2.2Km, 4 lane cable stayed bridge estimated cost 466/470 crores built by GSIDC. will be ready in 2.5years after work order issued.Bridge or flyover starting from Merces junction to Porvorim Pundalik nagarPM Narendra Modi laid foundation stone or formal inauguration of the project on 14th June 2014CM Parrikar now says - dt. 12.6.14it will be ready in 20-24 monthsAll formalities/approvals done, soil testing will start soon and work will start Mid Sept. 2014The bridge will be 15 meters higher than the existing two (which would be about 25mtr over the water level) to save mangroves etcAbout 900 mtrs from Porvorim side, 600mtrs over the River and 700 mtrs panjim side.The project includes flyover towards Ponda side.Porvorim sideVideo 1: New Bridge, Jetty status 7.4.15www.youtube.com/watch?v=I7x-JxWfwrQwatch and compare this video report 2 years agoVideo 2: Jetty Renovation etc status 7.5.2013www.youtube.com/watch?v=uMi_uRCkfyc |
撮影日 | 2015-04-07 12:39:34 |
撮影者 | joegoauk72 |
タグ | |
撮影地 | |
カメラ | DSC-HX60V , SONY |
露出 | 0.001 sec (1/800) |
開放F値 | f/3.5 |